Research Articles | Challenge Journal of Concrete Research Letters

Multiple repair scenario of life cycle cost of RCC girder bridge using Markov chain model

Md. Shafiqul Islam, Shayla Sharmin, Jebunnesa Islam


DOI: https://doi.org/10.20528/cjcrl.2019.04.001
View Counter: Abstract | 470 times |, Full Article | 179 times |

Abstract


At present, many road authorities in the world face challenges in condition monitoring diagnosis of distress and forecasting deterioration, strengthening and convalescence of aging bridge structures. The accurate prediction of the future condition is crucial for optimizing the maintenance activities. It is very tough to predict the actual performance scenario or actual in–situ structures without carrying out inspection. Limited availability of detailed inspection data is considered as one of the major drawbacks in developing deterioration models. In State Based Markov deterioration (SNMD) modelling, the main job is to estimate transition probability matrixes (TPMs). In this paper, Markov Chain Monte Carlo (MCMC) is used to estimate TPMs. In Markov Chain Model, future conditions depend on only present bridge inspection data. Multiple repair options are adopted in order to optimize life cycle cost. Repairs are needed when the critical chloride concentration exceeds 0.2. Three distinct types of cost corresponding to each repair option is considered. The objective of this paper is to minimize the life cycle cost considering appropriate repair timings of mixed repair methods. Variation of life cycle cost of five different concretes (stronger to weaker) using three different repair option is shown in this paper. For specific normalized condition of concrete’s failure probability (0.3) and specific type of concrete, variation of life cycle cost using multiple repair options is also shown in this paper.


Keywords


Monte Carlo simulation; Markov chain; transition probability matrix; repair matrix

Full Text:

PDF

References


Elbehairy H (2007). Bridge Management System with Integrated Life Cycle Cost Optimization. Ph.D thesis, University of Waterloo, Waterloo, Ontario, Canada.

Hegazy T, Elbeltagi E, El-Behairy H (2007). Bridge Deck Management System with integrated life cycle cost optimization. Transportation Research Record: Journal of the Transportation Research Board, 1866(1), 44-50.

Hrvatske R (2013). Bridge condition forecasting for maintenance optimization. Journal of the Croatian Association of Civil Engineers, 65(12), 1079-1088.

Li L, Sun L, Ning G (2014). Deterioration prediction of urban bridges on network level using Markov chain model. Mathematical Problems in Engineering, 2014, 728107.

Nogueira CG, Leonel ED, Coda HB (2012). Probabilistic failure modelling of reinforced concrete structures subjected to chloride penetration. Journal of Advanced Structural Engineering, 4(1), 1-14.

Possan E, Andrade J (2014). Markov Chain and reliability analysis for reinforced concrete structure service life. Materials Research, 17(3), 593-602.

Saeed Hasan Md, Setunge S, Law DW, Koay Y (2014). Forcasting deterioration of bridge components from visual inspection data. International Journal of Engineering and Technology, 7(1), 40-44.

Setunge S, Saeed Hasan Md (2011). Concrete bridge deterioration prediction using Markov-chain model. Digital Library, 17(3), 593-602.

Shafiqul Islam Md, Kanti Baul P, Haque O (2018). Observation of chloride permeability between normal aggregates concrete and recycled aggregates concrete containing fly ash and clay. Challenge Journal of Concrete Research Letters, 9(4), 103-109.


Refbacks

  • There are currently no refbacks.